Aidamir

Aidamir

" "

Providing Innovative Construction Solutions

About Us

General information and specifications
550x420
550x420

Aidamir Construction Company

Dedicated, fully-integrated and a premium class building contractor

Member of the Association of Mass Builders of Housing and Construction of East Azerbaijan Province

Chairman’s Message

Managing Director and Chairman about Aidamir Messages
250x389
250x389

Mr. Majid Mokhtar Sasani

Managing Director and Chairman




Mrs. Samira Abdollahzadeh

Vice Chairman of the Board


In 2001, riding on the business acumen of the leadership team of the firm, backed by the strength and dynamism of the Iran economy and with complete confidence in its founding members and its workforce.


We extend heartfelt thanks to our clients for giving us the opportunity to undertake their projects and for having such confidence in AIDAMIR co.


Last, but by no means least, a warm word of thanks to our own employees: the foundation and pillars of our success, who have shown care and responsibility at every turn and who have enabled us to become, in the space of a few years, one of the leading construction firm in the region.


Majid Mokhtar Sasani

Managing Director and Chairman

Vision

Our vision is to be a prominent and leading construction firm in the region specializing in all engineering disciplines that offer extraordinary development both locally and in the international community


Mission

Our mission is to maintain long term feasible business operations and to successfully complete projects ensuring timely completion and quality standards

capability1 - 5 years of experience95%
capability2 - 3 years of experience85%
capability3 - 4 years of experience75%
capability4 - 6 years of experience90%

CAPABILITIES

Meet our amazing services
  • layers

    Resources

    ⬤ AIDAMIR co. employs up to 500 employees that includes hundreds of professional engineers and thousands of skilled technicians with expertise in various trades. Our employees work together to deliver quality construction projects.


    ⬤ Our resources include several large fully-equipped facilities with own plant, machineries, tools and equipment including a large fleet of heavy and light vehicles, tower cranes, excavators, dozers, loaders, rock trucks, haul trucks and trailers, drills and various other pieces of equipment which give AIDAMIR co. the capability to carry out a wide spectrum of heavy construction works.

  • seo-performance-marketing-graphic

    Strength

    AIDAMIR co. is capable of delivering large scale projects of various engineering disciplines and capable of delivering projects in different sectors such as:

    ⬤ High rise buildings

    ⬤ Hotels and resorts

    ⬤ Residential (apartments)

    ⬤ Commercial (offices)

    ⬤ Villas and Townhouses

    ⬤ Cultural centers and conference halls

    ⬤ Warehouse and construction factories

    ⬤ Academic building such as schools & universities

    ⬤ Interiors

    ⬤ Infrastructure

IMPORTANT PROJECTS

Indicative projects carried out by the company
  • Aidamir Aidamir

    January, 2019 Road

    ⬤ Project Location: Tabriz

    ⬤ Area: 1332403 Square meters

    ⬤ Project Cost: 17,500,000 $

    ⬤ Start of project: 2019

    ⬤ Contract duration: 36 months

    ⬤ Status: Under construction

    To build a new city or Township, surveying is to be done by considering all development works necessary for the city. The development works like street roads, property boundaries, water and sanitary pipes location, electrical lines, telephone lines etc. are involved in the city surveying. In the preparation of topographic map, the whole area on which a township is going to build is divided into number of sectors. Each sector is enclosed by a polygon which are having a connection on common sides. In each sector, closed traversing is conducted using theodolite.

  • Aidamir Aidamir

    February, 2015 Construction

    ⬤ Project Location: Khavaran - Tabriz

    ⬤ Area: 23000 Square meters

    ⬤ Project Cost: 25,000,000 $

    ⬤ Start of project: 2015

    ⬤ Contract duration: 30 months

    ⬤ Status: Completed

    Tabriz International Conference Center is a conference center in the east of Tabriz in the Khavaran area, with a capacity of 2 in the main hall and 3 in the sub hall. This conference center is the largest conference center in northwestern Iran. The Tabriz International Conference Center was built over two years and was launched in February 2008 by Iranian President Hassan Rouhani.

  • Aidamir Aidamir

    April, 2009 Construction

    ⬤ Project Location: Sahand City

    ⬤ Area: 12188 Square meters

    ⬤ Project Cost: 32,000,000 $

    ⬤ Start of project: 2009

    ⬤ Contract duration: 48 months

    ⬤ Status: Completed

    This three-story complex is made up of several stores, restaurants and coffee shops, and the products of many famous brands can be easily found here. You can find the latest women, men, children's clothes, bags and shoes along with unique costume jewelries in this shopping center. These restaurants provide toothsome foreign and Iranian cuisines with high quality. You can enjoy your time here with your friends and family after shopping. The coffee shops are also very luxury.

  • Aidamir Aidamir

    February, 2010 Construction

    ⬤ Project Location: Sahand City

    ⬤ Area: 9520 Square meters

    ⬤ Project Cost: 9,000,000 $

    ⬤ Start of project: 2010

    ⬤ Contract duration: 24 months

    ⬤ Status: Completed

    • Creating narrower streets.

    • Design of wider sidewalks.

    • Using shelter and pavement design.

    • Considering human scale and maintaining a balanced height for buildings.

    • Eliminate "dead spaces"

    • Blank ranges and inappropriate views disrupt the flow of pedestrians on the track.

    • Create access to adjacent ranges.

    • Create simple, logical and understandable circulation for pedestrians and motorcyclists.

    • Providing food services such as an open-air restaurant or cafe with outdoor seating design and cozy areas.

    • Designing the right furniture for the activity.

    • Location of building on the ground

  • Aidamir Aidamir

    February, 2009 Construction

    ⬤ Project Location: Sahand city

    ⬤ Area: 15810 Square meters

    ⬤ Project Cost: 11,700,000 $

    ⬤ Start of project: 2009

    ⬤ Contract duration: 30 months

    ⬤ Status: Completed

    • Creating narrower streets.

    • Design of wider sidewalks.

    • Using shelter and pavement design.

    • Considering human scale and maintaining a balanced height for buildings.

    • Eliminate "dead spaces"

    • Blank ranges and inappropriate views disrupt the flow of pedestrians on the track.

    • Create access to adjacent ranges.

    • Create simple, logical and understandable circulation for pedestrians and motorcyclists.

    • Providing food services such as an open-air restaurant or cafe with outdoor seating design and cozy areas.

    • Designing the right furniture for the activity.

    • Location of building on the ground

OTHER PROJECTS

Various projects done by the company
  • 0

    Projects Completed
  • 0K

    Square meters
  • 0

    City Projects
  • 0+

    My Awards

Contact Me

Get in touch with Aidamir co.